Healthcare

Wheaton Franciscan Hospital Franklin
 

Wheaton Hospital Franklin-A Lemberg Electric ProjectNew 410,000 square foot hospital in Franklin WI completed June of 2008.  Project consisted of a primary automatic transfer electrical service, two 750 kW synchronized generators, eight automatic transfer switches, fire pump emergency and normal power, lightning protection, uninterruptible power system, emergency distribution, radiology suit (MRI, CT scan, RAD, nuclear and RF), women’s imaging suit (mammography, ultra sound, stereo-tactical), bone densitometer, (35) patient beds, emergency department, complete physical therapy, cardiac rehabilitation, sleep disorder, doctors offices, (4) operating rooms, (2) minor procedures, lab services.  Complete fire alarm system, nurse call system and paging system.

Waukesha Memorial Hospital
 

Waukesha Memorial Hospital-a Lemberg Electric ProjectSouthwest tower remodel and infrastructure upgrade.  Project consisted of remodeling two patient care floors and upgrade of the electrical distribution on the south west wing of the hospital. Updated the 208 volt and 480 volt infrastructure (without interruption to hospital services) by replacing four substations, five transfer switches along with multiple panels and feeders.  Upgrading the infrastructure needed to be planned and accomplished in phases.  Project required various areas of the hospital to be re-fed while new construction continued. 

© 2010 Lemberg Electric Company Inc.
This site is powered by Titan Hosted CMS