Lemberg's Electrical Service team provided new LED lighting at the Hunger Task Force new location in Milwaukee. The existing lighting in the new location was inadequate and poorly laid out for the needs of the organization. 

The team designed a new, cost-effective LED lighting design that considered different areas of the building and their respective uses. They also worked with the customer to determine the best lighting controls for their needs. Off-site prefabrication was used to keep disruption to a minimum and provide an efficient timeline for the customer. 

In an ongoing effort to serve the Hunger Task Force, Lemberg's Data Communications team also provided a new fire alarm system for Hunger Task Force in 2022.

Project Features

  • LED Lighting
  • Lighting Controls
  • Prefabrication
  • Design Build
  • Fire Alarm

Details:

Location: Milwaukee, WI

Industry: Institutional/Education

Divisions: Service, Data

Project Type: New Construction

Year Completed: 2021