 
      
       
      
      
       
      
      
       
      
      
       
      
      
    Saint Augustine Preparatory Academy
Lemberg has provides electrical construction and ongoing electrical, data and sign services for the St. Augustine Preparatory Academy (St. Aug Prep) South and North campuses. St. Aug Prep provides a non-denominational Christian-based K4-12 education to students of all backgrounds.
Lemberg is currently providing electrical services for the new construction and renovation of existing buildings on the grounds of the former Cardinal Stritch University campus -- St. Aug Prep's new K-12 North Campus, set to open in 2026. Lemberg supports the mission of St. Aug Prep by donating a portion of the electrical renovation. This allows St. Aug Prep to stretch their budget and provide their future students with the best possible environment for learning.
In 2023, Lemberg completed the electrical, low voltage work, and sign installation for St. Aug Prep's new 123,000-square-foot building for students in grades K4 through 5 located on newly annexed property near the existing South Campus. In addition to regular and specialized education and music classrooms, the new school features a full-sized gym, a small gym, library and resource area, a rooftop play are, traditional playgrounds, and performing arts center/auditorium and an area dedicated to crafting theatre sets. The teams provided regular and specialty electrical service and wiring, lighting, lighting controls, and the low voltage data cabling for building security and door access, clocks, fire alarm, intercom, and WIFI.
In 2017, Lemberg completed the electrical, low voltage and sign installation for St. Aug Prep's South Campus Secondary School. The project timelines were well-executed and coordinated with the general contractor and other trades. Use of prefabrication and an on-demand delivery schedule kept the job site clear of extra supplies. The project included electrical construction, lighting and state-of-the-art lighting and environmental controls. Lemberg worked with administrators and teachers to ensure the needs of each classroom or area were met. This school opened on time in the fall, serving students and staff with a bright, cheerful, state of the art facility of classrooms, large group areas, natatorium, cafeteria, library, and more.
Lemberg Signs and Lighting provided the signage for both the North Campus and South Campus, including signage for the new Performing Arts Center.
See the St. Augustine Preparatory Academy website for photos and additional information.
Project Features
- Electrical Service
- Lighting
- Lighting Controls
- Electrical Wiring
- Fire Alarm
- Security, Door Access
- WIFI
- Auditorium / Theatre
- Natatorium
- Signage
- Specialty Power
Details:
Location: Milwaukee, WI
Industry: Institutional/Education
Divisions: Construction, Data, Signs
Project Type: New Construction
Year Completed: 2017/2023