Back To Projects
Saint Augustine Preparatory Academy Signage - South Campus
Lemberg Signs and Lighting provided the exterior brand signage for the new K4-5th grade education building on the St. Augustine Preparatory Academy's South Campus in Milwaukee, Wisconsin. This included signage for the new Performing Arts Center.
Lemberg has been serving St. Aug Prep in a variety of capacities since 2017.
- 2017: Lemberg completed the electrical construction, lighting and state-of-the-art lighting and environmental controls and signage for the South campus.
- 2023: Lemberg completed the electrical, low voltage work, and sign installation for St. Aug Prep's new 123,000-square-foot building for students in grades K4 through 5 located on newly annexed property near the existing South campus.
- 2026, Lemberg completed the electrical, low voltage work and sign installations for St. Aug Prep's new North campus in Glendale, Wisconsin.
Project Features
- Exterior Signage
- Channel Letters
- Building Mounted Signs
- Lighted Signs
Details:
Location: Milwaukee, WI
Industry: Institutional/Education
Divisions: Signs, Construction, Data
Project Type: New Construction
Year Completed: 2023