skip to main content
Projects By Industry
Back To Projects

Froedtert Integrated Service Center

For this project, an auxiliary building was built to house two 1000 KVA emergency generators with room for one more, each with its own 1200 gallon fuel tank. 

This created two layers of power outage protection and uninterrupted patient care for the facility. The generators are capable of providing full power within 10 seconds, a gap covered by another UPS power source. Branch and service wiring to the generators, branch circuiting, lighting, and power panels for main service distribution throughout the facility were also installed.

Project Features

  • 1000 KVA emergency generator
  • Uninterruptible Power Sources (UPS)
  • Electrical Power Distribution
  • Service wiring
  • Branch circuiting
  • Lighting

Details:

Location: Menomonee Falls, WI

Industry: Commercial

Divisions: Construction

Project Type: New Construction

Year Completed: 2018