skip to main content
Projects By Industry
Back To Projects

Froedtert West Bend Hospital

This was the new construction build out of the existing second floor of the Froedtert West Bend Hospital. This new area will be used by the Cancer Center at this location, offering coordinated care and a calm, healing environment to patients and their loved ones.

Lemberg's electrical construction team worked closely with both the hospital and the General Contractor to coordinate electrical shut downs to minimize outages in the operational portion of the facility but still allow safety of the crews working in the areas under construction.  The team made sure normal, critical, life safety and equipment branches of power were connected.

This project included the installation of all electrical wiring, distribution panels, lighting fixtures and fire alarm systems. This project is scheduled for completion in March 2024. 

Lemberg brings reliable comprehensive services to the healthcare industry, protecting patients, staff, information and privacy. Search our project database for more healthcare related projects. 

Project Features

  • Electrical wiring
  • Fire Alarm
  • Energy Efficient Lighting
  • Distribution panels

Details:

Location: West Bend, WI

Industry: Healthcare

Divisions: Construction

Project Type: New Construction

Year Completed: 2024